Adven Oy: Terrafame NiSU project
We were a major supplier to Terrafame’s NiSU project involving its nickel sulphate production facility. We delivered the battery chemical plant’s pipe bridges, the ammonia plant, the crystallization plant and the water plant to Terrafame.
We manufactured the pipe bridges at our plant as 54 modules: the total length of the pipe bridges was 1.3 kilometres, and they weighed a total of 850 tonnes.
