Stora Enso Oulu Oyj: Board mill renovation phase 2 (modification works on the old pipe bridges)
At Stora Enso’s board mill, the old paper machine was converted into a board machine. In this project, we modernised the old pipe bridges and installed new pipework on them.
Cramped installation sites on a large construction site, large pipes (up to DN900 size) and sizable lifts required careful coordination from project management.
