Helen Oy

We carried out the installation of cooling equipment and piping, including steel structures and insulation, for the pipeline project at the Salmisaari air-source heat pump plant. We installed 16 collectors and 16 heat pumps at the plant. The largest pumps weighed more than 10 tonnes.
For the demanding piping contract at the Salmisaari electric boiler plant, we manufactured and installed PED III-classified district heating piping under Module G, including insulation works. In the project, the piping size went up to the DN600. Thanks to the careful planning of work and skilled workforce, the project was completed within three months of the start of the installation work.