Vantaan Energia Oy

Together with an extensive subcontracting network, we carried out the fabrication and installation of pipe bridges and process piping for Vantaan Energia’s hazardous-waste incineration plant.
The turnkey delivery included pipework, steel structures, trace heating, insulation and electrical work.
The pipe bridges were manufactured at the factory as 15 modules: the total length was 216 metres and the weight was nearly 200 tonnes. The completed modules were transported for on-site installation. The project was carried out in accordance with high quality standards, and the materials used included high-performance superduplex and duplex materials, as well as P235GH, acid-resistant and stainless steels.